Lagos To Shut Down Ojota Road For 3 Months (Read More)

The Lagos Government has announced the shutdown of the entire length of the main carriageway of Ikorodu Road from Ojota interchange to Ojota Second Pedestrian Bridge from Monday, September 21, 2020, as part of the next phase of the ongoing rehabilitation work on the road.

Transport Commissioner, Dr. Frederick Oladeinde, advised all motorists to utilise alternative routes suggested during the 3-month duration stipulated for the repairs, following the closure of the main carriageway while reassuring Nigerians that the Lagos State Traffic Management Authority (LASTMA) and other law enforcement agencies will be available to direct traffic for free vehicular movement during the entire period of construction work.

β€œVehicles coming from Maryland will be diverted at Odoyalaro into the Service lane and the BRT Corridor to link back the main carriageway at Ketu bus stop and Demurin junction respectively,’’ Oladeinde said.

Be the first to comment

Please Comment